Product Features Solutions Pricing Learn Resources
Version 4.1 — Now Available

Know If Your Floor
Will Hit the Deadline.
Before the Shift Ends.

TaktClock is a Windows-based digital takt time monitoring system. Every operator gets a live countdown. Every supervisor gets a live floor map. Every plant manager gets live KPIs — all from your existing Windows network.

Buy Now  ↗
No MES required·No new hardware·On-premises·Windows 10/11·From $299/month
TaktClock — Operations Dashboard
Hours Produced
847.5 / 960h
Hour Adherence
86.8%
Schedule Adherence
91.2%
Active Sessions
11
Emp #MO NumberPartAreaProcessSubprocessElapsedRemainingStatus
7214MO-7821044HRNS-AL-6061-AAssembly Line 1WiringTerminal Crimp01:12:3000:31:44On Time
6831MO-7820998CTRL-PNL-12AAssembly Line 2AssemblyFinal Assembly02:31:14−00:21:14Over Takt
5522MO-7821051BKT-304SS-07BMachiningAssemblySub-Assembly00:44:1000:51:05On Time
8803MO-7820965HRNS-AL-6061-AAssembly Line 1WiringConnector Install03:14:00−00:44:00Over Takt
4417MO-7821063MTR-MNT-PL-4CMachiningAssemblyHipot Test01:02:0000:28:14On Time
9001MO-7821070BKT-304SS-07BMachiningAssemblyDimensional00:28:4401:06:10On Time
● LIVEUpdates every 30 secondsDenton TX — Mfg Hall A
Floor Map — Mfg Hall A
Denton TX — Mfg Hall A
LIVE · 11 operators
Assembly Line 1
On Pace
4 active sessions
Assembly Line 2
Over Takt
2 over takt
Machining
On Pace
4 active sessions
Wiring & Test
On Pace
3 active sessions
Inspection
Idle
Shipping
Idle
Hours Produced
847.5 / 960h
Hour Adherence
86.8%
Schedule Adherence
91.2%
EMP 7214 — Assembly Line 1
01:12:30
Elapsed Time
Started 07:44 AMStandard 01:44:00
REMAINING: 00:31:30
Process
Wiring
Subprocess
Terminal Crimp
Std Hours
01:44:00
MO
MO-7821044
EMP 6831 — Assembly Line 2
02:31:14
Elapsed Time
Started 06:02 AMStandard 02:10:00
⚠ Over takt — exceeded standard by 21 min 14 sec
REMAINING: −00:21:14
Process
Assembly
Subprocess
Final Assembly
Std Hours
02:10:00
MO
MO-7820998
Yamazumi Chart — Subprocess View
Live Yamazumi
Avg takt: 2.22 h · Professional+
5.5h5.0h4.5h4.0h3.5h3.0h2.5h2.0h1.5h1.0h0.5h0
TAKT
7214
5522
6831
8803
4417
9001
★ Professional feature — also includes Bottleneck, Capacity, Trends, Executive KPI, SMED, Kaizen, Skills, Handover, Alerts, Downtime
Weekly Schedule — 2026-W12
Week 12 — Mar 2026 18 MOs · 4 Complete · 2 Overdue
MO NumberPart NumberAreaPriorityDue DateStatus
MO-7821044HRNS-AL-6061-AAssembly Line 1HIGH03/13/2026In Progress
MO-7820880CTRL-PNL-08BAssembly Line 2MEDIUM03/07/2026Complete
MO-7820912GRD-PNL-HDPEMachiningHIGH03/05/2026Overdue
MO-7821155MTR-MNT-PL-4CMachiningLOW03/14/2026Not Started
MO-7820998CTRL-PNL-12AAssembly Line 2HIGH03/10/2026In Progress
Deployed at · Aerospace & Defense Manufacturers · Electronics Assembly Facilities · Industrial Equipment Manufacturers · Defense Subcontractors · Precision Fabrication Shops
Why TaktClock

Built for the floor. Not the boardroom.

Every delay on the production floor was visible before it became a problem. You just had no system to see it. TaktClock is that system.

Live Per-Operator Takt Timer
Every operator gets a live countdown against their subprocess standard hours. The moment they exceed takt, the timer turns red and goes negative. No ambiguity.
🗺
30-Second Floor Map
Every production area colored green or red, updated every 30 seconds. Replace the floor walk with a screen. Supervisors know who's behind before it compounds.
📊
Live Yamazumi Chart
Built from actual session data — not a quarterly time study. CI engineers see today's cycle time distribution, the real takt line, and which subprocesses are driving delay.
🔒
100% On-Premises
All data stays on your Windows network. No cloud dependency. No external data transmission. ITAR and CMMC boundary compatible. Runs on hardware you already own.
Feature 01

Every session. Every 30 seconds.
Nothing hidden.

The Operations Table shows every active Manufacturing Order across your entire facility in one live view. Employee number, MO, part, area, process, subprocess, elapsed time, remaining time, and status — all color-coded, all live.

Green means on pace. Red means over takt. You see it the moment it happens — not at end of shift.

9-column operations table
Full context for every active MO in the building
3 live KPIs above the table
Hours produced, hour adherence, schedule adherence
Filter by area, MO, or part
Instantly narrow 200 sessions to the ones you need
TaktClock — Operations Dashboard
Hours Produced
847.5 / 960h
Hour Adherence
86.8%
Schedule Adherence
91.2%
Active Sessions
11
Emp #MO NumberPartAreaProcessSubprocessElapsedRemainingStatus
7214MO-7821044HRNS-AL-6061-AAssembly Line 1WiringTerminal Crimp01:12:3000:31:44On Time
6831MO-7820998CTRL-PNL-12AAssembly Line 2AssemblyFinal Assembly02:31:14−00:21:14Over Takt
5522MO-7821051BKT-304SS-07BMachiningAssemblySub-Assembly00:44:1000:51:05On Time
8803MO-7820965HRNS-AL-6061-AAssembly Line 1WiringConnector Install03:14:00−00:44:00Over Takt
4417MO-7821063MTR-MNT-PL-4CMachiningAssemblyHipot Test01:02:0000:28:14On Time
9001MO-7821070BKT-304SS-07BMachiningAssemblyDimensional00:28:4401:06:10On Time
● LIVEUpdates every 30 secondsDenton TX — Mfg Hall A
Feature 02

A countdown on
every operator's screen.

The timer counts up from zero against the standard hours for the operator's specific subprocess. The progress bar fills as time passes. It turns red the instant standard time is exceeded. The remaining counter goes negative in HH:MM:SS so overrun is impossible to miss.

An airplane pacing indicator tracks position across the screen — readable from 10 feet without reading numbers. Two modes: Per Subprocess (default) or Per Part Number.

Visual progress bar Negative remaining time Airplane pacing visual Subprocess-level standard hours
EMP 7214 — Assembly Line 1
01:12:30
Elapsed Time
Started 07:44 AMStandard 01:44:00
REMAINING: 00:31:30
Process
Wiring
Subprocess
Terminal Crimp
Std Hours
01:44:00
MO
MO-7821044
EMP 6831 — Assembly Line 2
02:31:14
Elapsed Time
Started 06:02 AMStandard 02:10:00
⚠ Over takt — exceeded standard by 21 min 14 sec
REMAINING: −00:21:14
Process
Assembly
Subprocess
Final Assembly
Std Hours
02:10:00
MO
MO-7820998
Feature 03

Replace the floor walk
with a screen.

The floor map shows every production area colored green (on pace) or red (over takt), updated every 30 seconds. Supervisors know the status of every area from their desk — no walking required.

Above the map: three live KPIs that update every 30 seconds. Hours Produced vs. planned. Hour Adherence %. Schedule Adherence %. The numbers your plant manager asks for, available all shift.

Floor Map — Mfg Hall A
Denton TX — Mfg Hall A
LIVE · 11 operators
Assembly Line 1
On Pace
4 active sessions
Assembly Line 2
Over Takt
2 over takt
Machining
On Pace
4 active sessions
Wiring & Test
On Pace
3 active sessions
Inspection
Idle
Shipping
Idle
Hours Produced
847.5 / 960h
Hour Adherence
86.8%
Schedule Adherence
91.2%
Feature 04 — Professional+

Your Yamazumi is live.
Not from last quarter.

TaktClock captures actual elapsed time from every session. The Yamazumi Chart is built from that data — not from a time study conducted six months ago. The takt line is drawn from the real average expected time across live sessions.

CI engineers see today's cycle time distribution every shift. The Bottleneck tab shows which subprocess is causing the most delay — automatically, without a time study.

Live Yamazumi — subprocess level
Real takt line from actual session data
Bottleneck identification tab
Which subprocess drives the most delay — updated every shift
One-click Power BI CSV export
All session data to your existing BI tools
Yamazumi Chart — Subprocess View
Live Yamazumi
Avg takt: 2.22 h · Professional+
5.5h5.0h4.5h4.0h3.5h3.0h2.5h2.0h1.5h1.0h0.5h0
TAKT
7214
5522
6831
8803
4417
9001
★ Professional feature — also includes Bottleneck, Capacity, Trends, Executive KPI, SMED, Kaizen, Skills, Handover, Alerts, Downtime
Deployment

Live today. Not next quarter.

One Windows machine runs the server. Every other PC on the network runs the client. No cloud. No IT project. Most sites go live in under one business day.

01

Install the Server

Copy TaktClock_Server.exe to an always-on Windows PC. Launch it, open Settings → Licence, paste your key, click Activate. Server is ready.

Requires TCP port 5000 open · Windows 10/11
02

Deploy to Operator PCs

Copy TaktClock.exe to each operator PC or run from the network share. On first launch enter the server IP. Never asked again. No per-seat keys.

Unlimited client connections per licence
03

Configure & Go Live

Open Key User → Data Entry to add areas, processes, subprocesses, standard hours, and employees. Save to Excel. Your floor is live.

Key User login = taktclock.io email + password
Learning Center

Lean & Six Sigma.
Explained clearly.

Our learning center covers the full stack of lean-sigma methodology — from 5S basics and takt time fundamentals to advanced Yamazumi analysis, SMED, OEE, and Six Sigma tools. Written for plant managers and CI engineers who need straight answers, not textbook definitions.

5S Methodology Takt Time Yamazumi Charts Line Balancing Six Sigma PQPR Matrix VSM SMED OEE Kaizen
Explore Learning Center →
Pricing

One facility. Unlimited operators.
One price.

No per-seat fees. A single site licence covers every operator, every screen, and every production area in your facility.

Starter
$299/month
1 facility · up to 25 employees
Live takt timer per operator
Operations Table dashboard
Floor Map view
Weekly Schedule view
Power BI CSV export
Manual / Excel standard hours
Email support
Pilot deployments · single-line shops
Buy Starter →
Enterprise
Custom
Unlimited facilities & employees
Everything in Professional
Unlimited facilities & admins
All ERPs + custom adapters
Dedicated success manager
SLA & enterprise support
Source code escrow available
Multi-site manufacturers · group rollouts
Get Started

30 minutes. Live product.
No slide deck.

We'll configure TaktClock with your areas, your processes, your standard hours. Ask anything. Straight answers. Most teams go live the same day they see the demo.

Buy Now on Whop