ProductFeaturesSolutionsLearnResources
Learning Center

Lean & Six Sigma tools for the plant floor.

Interactive guides for plant managers and CI engineers. From takt time fundamentals to QRQC implementation — built to complement what TaktClock shows you on the floor.

Lean Fundamentals

Core concepts

Lean
What Is Takt Time? A Plant Floor Definition
Takt time is not a pace target — it's the maximum time available per unit to meet customer demand. Most plants confuse it with cycle time. Here's the difference and why it matters.
📊
Lean
Building a Yamazumi Chart from Real Data
A Yamazumi chart is only as useful as the data behind it. This guide covers how to build one from actual session times — not estimates from a time study conducted months ago.
🎯
Lean
Theory of Constraints on the Assembly Line
TOC applied to discrete manufacturing. How to identify your constraint, exploit it, and subordinate everything else — using real-time data instead of assumptions.
🔁
Lean
Standard Work: Writing It for Subprocesses
Standard work documentation at the subprocess level — the format that connects to TaktClock's subprocess standard hours for accurate takt tracking.
📈
Lean
Schedule Adherence vs. Hour Adherence: What Each Measures
Two metrics that sound similar but measure different failure modes. Understanding the difference tells you whether your problem is pace or planning.
📦
Lean
Line Balancing: Moving Work Between Operators
How to use Yamazumi data to rebalance a production line — which tasks to move, how much to expect, and how to validate the improvement.
CI Tools & Methods

Improvement tools

Tool
SMED: Reducing Changeover Time in 5 Steps
Single Minute Exchange of Die methodology adapted for complex assembly environments. How to classify, externalize, and eliminate changeover steps.
💡
Tool
Kaizen Events That Stick: A Practical Framework
Most Kaizen events produce a great week and no lasting change. This guide covers pre-work, execution, and follow-up that connects to production data.
🚩
Andon
Andon Systems: Principles and Digital Implementation
Andon is a signal, not just a cord. How the stop-at-first-defect philosophy translates to takt-based alerting in a digital monitoring system.
Tool
Downtime Pareto: Categorizing and Prioritizing Loss
How to set up a downtime categorization system that gives you actionable data, not just hours lost. Which categories matter most and how to prioritize.
👨‍🏭
Tool
Skills Matrix: Building Cross-Training Flexibility
A skills matrix that connects to your takt data — so when a bottleneck appears, you know in seconds which operators can cover it.
🔄
Tool
Shift Handover: Structured Information Transfer
What gets lost between shifts and how a structured handover process prevents the incoming supervisor from starting blind.
Quality & Response

Quality tools

🚨
QRQC
QRQC: Quick Response Quality Control on the Line
Stop at the first deviation. Investigate immediately. Close the loop before the shift ends. How QRQC connects to takt monitoring for real-time response.
📌
Six Sigma
Process Capability: Cp, Cpk, and What They Actually Mean
Capability metrics explained for production managers — not statisticians. How to read Cp and Cpk and what action to take when they're below 1.33.
🗺
Six Sigma
Value Stream Mapping: Current State to Future State
VSM for complex discrete manufacturing. Mapping material flow, information flow, and time data from a system like TaktClock to build your future state.
Video Library

Video tutorials — coming soon.

Short video walkthroughs of each TaktClock feature and lean concept. Sign up below to be notified when they're available.

Coming Soon
Setting Up TaktClock: 10-Minute Install
Estimated: ~12 min
📊
Coming Soon
Reading the Live Yamazumi Chart
Estimated: ~8 min
🔭
Coming Soon
Connecting TaktClock to Infor M3
Estimated: ~15 min
Apply What You've Learned

See these concepts running live in TaktClock.

30-minute demo. We'll walk through the Yamazumi Chart, Bottleneck tab, and QRQC-aligned alerting on your production configuration.

Read the Blog